Top Pharmaceuticals Come from the Pharma Valley

Integra 2020 - hero photo

Investment and Development Project for the Future of JGL

The new investment Integra represents the future of our company on the path of stable and sustainable growth, with a significant impact on the development of the pharmaceutical sector in the EU. As part of the first phase of the project, Pharma Valley, our unique production and scientific complex near Rijeka, was developed.

Pharma Valley

Pharma Valley

The first phase of the investment in the Pharma Valley complex was completed in 2015. The entire investment includes the production site Svilno 1 (automated production of eye drops, microbiological laboratory and sterility laboratory) and Svilno 2 (storage facilities, production facilities, power plant, IT server, offices and accompanying facilities). The project was co-financed by the European Union.

Integra

Integra

Integra is our investment and development project completed in 2023, that includes the construction of a sterile plant for pharmaceutical production, research and development, a new pilot plant, and a robotised logistics and distribution centre at two sites – Svilno and Kukuljanovo. This investment ranks us among companies whose investments in development significantly surpass the European average.

01

Increasing the efficiency of production processes

02

Growth of our sterile production capacity by 60% and storage capacity by 100%

03

Optimisation of drug production – separate dosing and packaging lines

04

Focusing the Svilno location on the Pharma Valley

05

Increasing competitiveness through automation, robotics and digitisation

06

Providing technological resources for the future growth and development of the company

Integra video

Advanced Technological and Environmental Solutions

Throughout the Integra project, we have used advanced technological and environmental solutions to achieve maximum energy savings.

JGL and the Green Economy

JGL and the Green Economy

Solar panels for hot water preparation/production was our first foray into using renewable energy sources. While obtaining energy certifications, we identified our weak points and started thinking about how to reach a higher energy class. Today, for example, we only purchase electricity produced from renewable sources and are proud owners of the ZelEn green energy trademark.

Energy-Efficient Solutions We Use

Energy-Efficient Solutions We Use

  • Use of renewable energy sources
  • Free-cooling system
  • Use of bicycles and hybrid vehicles
  • Construction of facilities with A and A+ certificates
Our Green Future

Our Green Future

  • Installation of a new 115 kW photovoltaic power plant
  • Using batteries to store energy
  • Construction of our own charging station for electric vehicles
  • Continuous reduction of CO2 emissions
  • Gasification of the Svilno site
EU sufinanciranje

The project is co-financed by the European Union from the European Regional Development Fund

Learn more